#cost-overruns

[ follow ]
#federal-reserve
fromFortune
1 week ago
US politics

Pirro drops Powell probe, handing Kevin Warsh a lifeline, though U.S. Attorney vows to restart probe 'should the facts warrant doing so' | Fortune

fromwww.npr.org
9 months ago
US news

Why the Federal Reserve's building renovations are attracting the White House's ire

The Federal Reserve's office renovation costs have escalated from $1.9 billion to $2.5 billion, igniting controversy with the Trump administration.
fromFortune
9 months ago
US politics

Trump admin's attacks on Powell over $2.5 billion Fed renovation hinge on 'VIP dining rooms' and procedural grounds with an obscure gov agency

White House officials accuse Jerome Powell of mismanaging Federal Reserve renovations, resulting in costs exceeding initial estimates by $700 million.
US politics
fromwww.cbc.ca
1 week ago

U.S. Justice Dept. ends probe into Federal Reserve chairman Jerome Powell | CBC News

The Justice Department is closing its investigation into Federal Reserve renovation cost overruns, while the Inspector General will continue scrutiny.
US politics
fromFortune
1 week ago

Pirro drops Powell probe, handing Kevin Warsh a lifeline, though U.S. Attorney vows to restart probe 'should the facts warrant doing so' | Fortune

The investigation into Fed Chair Jerome Powell is closed, shifting focus to the Federal Reserve's inspector general regarding building cost overruns.
fromFortune
9 months ago
US politics

Trump admin's attacks on Powell over $2.5 billion Fed renovation hinge on 'VIP dining rooms' and procedural grounds with an obscure gov agency

LA real estate
fromCalifornia Post
3 weeks ago

Exclusive | Ticketmaster millionaire throws huge fit over $24B high-speed tunnel planned near his Bel Air mansion

Metro's proposed rail project aims to reduce travel time from 90 to 18 minutes, but faces skepticism over costs and completion timelines.
Canada news
fromwww.cbc.ca
3 weeks ago

Toronto finally has funding for Waterfront East LRT, but city could be on the hook if project goes over budget | CBC News

Toronto secures funding for Waterfront East LRT, but will bear any cost overruns, raising concerns about financial responsibility.
California
fromwww.mediaite.com
1 month ago

60 Minutes Tackles CA's $125 Billion Train to Nowhere

California's high-speed rail project has faced significant delays and cost overruns, now estimated at $125 billion, with no tracks laid yet.
#hs2
#california-high-speed-rail
fromwww.bbc.com
2 months ago

Tories call for rethink of Parliament revamp

The Conservatives are calling for a proposed renovation of the Houses of Parliament to be paused and "refocused" over concerns about costs potentially running into the tens of billions. MPs have been presented with proposals to refurbish the ailing Palace of Westminster, including a plan that could cost almost 40bn and take 61 years to complete. The project team has warned delaying the restoration of the historic building, which costs 1.5m a week to maintain, would lead to "an expensive managed decline of the Palace".
UK politics
US politics
fromwww.amny.com
2 months ago

Gateway Tunnel: Trump slams rail project as boondoggle,' claims in social media rant it will cost billions more than expected | amNewYork

President Trump called the Gateway Tunnel a boondoggle, warned of multibillion-dollar cost overruns, and vowed the federal government will not cover any overruns.
fromwww.dw.com
2 months ago

Why Germany's big builds often run over time and budget

Berlin's new airport? Planned for 5 years, finished in 14. Stuttgart's central station? Still under construction after 16 years. Hamburg's concert hall, the Elbphilharmonie? Nine years instead of three. And the costs? Sometimes 10 times higher than promised. Or take Cologne's opera house. Built in the 1950s as a symbol of modern democracy, it was a cultural jewel.
Berlin
fromwww.independent.co.uk
2 months ago

NS&I slammed after spending 3bn of taxpayer money on full-spectrum disaster'

The Treasury-backed savings bank National Savings and Investments (NS&I) has been criticised over failing to control costs and have a viable plan in place to complete a business transformation project which is already two years late and has spent over 3bn in taxpayer money. NS&I has around 25 million customers which it serves through the Premium Bonds prize draw and fixed term savings bonds, representing more than an estimated 240bn. However, the transformation project has been condemned by a Public Accounts Committee (PAC) which says it has not yet managed to deliver any meaningful benefits for taxpayers.
UK politics
fromwww.dw.com
2 months ago

Why German building projects run over time and budget

Or take Cologne's opera house. Built in the 1950s as a symbol of modern democracy, it was a cultural jewel. By 2012, it needed renovation. The plan sounded simple: three years of work, reopening in 2015. Fast-forward to today: The building, which comprises the opera itself, a theater with two stages, and a children's opera with its own stage, remains a construction site.
Germany news
#eglinton-crosstown-lrt
fromwww.cbc.ca
2 months ago
Canada news

ANALYSIS | Experts urge Ontario to learn from Eglinton Crosstown communications missteps | CBC News

fromwww.cbc.ca
3 months ago
Canada news

Toronto councillor hosts rally to demand public inquiry into Eglinton Crosstown LRT | CBC News

fromwww.cbc.ca
2 months ago
Canada news

ANALYSIS | Experts urge Ontario to learn from Eglinton Crosstown communications missteps | CBC News

fromwww.cbc.ca
3 months ago
Canada news

Toronto councillor hosts rally to demand public inquiry into Eglinton Crosstown LRT | CBC News

fromwww.dw.com
3 months ago

2026 Winter Olympics: Fun events, but what about the bill?

The build up to the 2026 Winter Olympics in Milan and Cortina have been far from ideal. The ice rink has been delayed and riddled with issues. The bobsleigh track has been controversial from the start. History shows that many Winter Olympic hosts have also been plagued by late construction completions and rising costs, but perhaps 2026 represents a tipping point.
Miscellaneous
US politics
fromsfist.com
3 months ago

Extension of Central Subway to Fisherman's Wharf Gets Its First City Hall Hearing

Supervisor Danny Sauter seeks to extend the Central Subway to North Beach and Fisherman's Wharf, but federal funding is unlikely while Trump remains president.
fromSnowBrains
3 months ago

Why Denver, CO, Declined to Host the 1976 Winter Olympics - SnowBrains

The decision initially gained support from Colorado business leaders, Governor John Love, and even the Nixon White House. However, it wasn't long before public opposition emerged. Led by State Representative Richard Lamm and the group Citizens for Colorado's Future, they argued that hosting the Olympics would place an unnecessary financial burden on taxpayers and the environment. The Denver Olympic Organizing Committee and its inability to manage the growing costs led to a significant loss of public confidence.
Snowboarding
fromwww.bbc.com
3 months ago

New Birmingham-Manchester rail link planned

The government is set to announce its intention to build a new rail link between Birmingham and Manchester, the BBC understands. Previous plans for the HS2 high-speed rail line had included a line between the two cities, but that part of the project was scrapped by Rishi Sunak's government. On Wednesday, the government is expected to confirm proposals for new and improved rail links across the North of England in a scheme known as Northern Powerhouse Rail (NPR).
UK news
US politics
fromBusiness Insider
4 months ago

There's no silver bullet to the US Navy's shipbuilding woes: report

The US Navy's shipbuilding enterprise consistently fails to produce ships at required scale, speed, and cost, jeopardizing fleet growth as China's navy advances.
US politics
fromJezebel
4 months ago

Dumb Ballroom Won't Be Done Until Summer 2028, as Trump Finds Idea of Third Term 'Interesting'

Trump's planned White House ballroom project doubled in cost and delayed to 2028, fueling concerns he could pursue an illegal third term with donor backing.
World news
from24/7 Wall St.
5 months ago

26 Weapons the Military Regrets Ever Purchasing

Some military weapons proved unreliable, dangerous, or too costly, revealing procurement, engineering, and political failures that shaped future defense decisions.
Germany news
fromwww.dw.com
5 months ago

'Stuttgart 21' high-speed rail opening delayed once more DW 11/19/2025

Stuttgart 21 opening delayed beyond December 2026 due to intensified deadline risks linked to the Stuttgart Digital Node digitized signaling system.
fromTheregister
5 months ago

Why ERP projects so often end in disaster

"There's so much that can go wrong," she told The Register. "From the beginning, we're talking with clients, and we're hearing a technology conversation without any type of business input, and that happened today. We're always steering clients back to the fact that this is business transformation. There needs to be executive sponsorship, there needs to be evidence that the organization is actually preparing itself for change - how they're going to operate - and not just replacing an application."
Business
fromApp Developer Magazine
1 year ago

DevOps migration index find big bang platform migrations drain budgets

The survey found that 57 percent of respondents spent more than $1 million on migration projects in the previous year, and those efforts ran an average of 18 percent over budget. Beyond financial strain, nearly 70 percent of technology leaders reported increased developer burnout and declining morale following major migrations. Perhaps most concerning, 75 percent said that security integrations became harder to maintain after consolidation.
Software development
World news
fromFuturism
5 months ago

You'll Never Guess What Happened to Saudi Arabia's 100-Mile Skyscraper

The Line, a proposed 105-mile megacity in Saudi Arabia's Neom, has stalled and been drastically scaled back amid cost, delays, and human rights concerns.
fromIndependent
6 months ago

MetroLink's cost overruns to be split between State and contractors

Logistical challenge of housing the workforce necessary for the project set to become a headache Cost overruns on the multi-billion euro MetroLink project are expected to be split between the State and contractors to avoid repeating mistakes of the new National Children's Hospital, which has seen massive budget overruns. New documents obtained by the Sunday Independent also reveal that developers leading the project will be incentivised to deliver the underground railway on budget and on time.
Miscellaneous
UK politics
fromwww.theguardian.com
6 months ago

UK ministers take control of 10bn Lower Thames Crossing

Responsibility for the £10bn Lower Thames Crossing has been moved from National Highways to the Department for Transport to centralise cost oversight.
#rikers-island
US politics
fromwww.dw.com
7 months ago

Fact check: Trump repeats false claims at speech before UN DW 09/24/2025

President Trump's UN statements contained inaccuracies and misleading claims, including a false $500 million bid and inflated UN renovation cost figures.
fromwww.dw.com
7 months ago

Fact check: Trump repeats false claims in UN Speech DW 09/24/2025

At the United Nations, President Trump repeated long-debunked claims about ending wars, renewable energy, climate science, and even the UN's own renovation costs. Trump's address to the United Nations General Assembly on Tuesday was riddled with inaccuracies and exaggerations. He recycled familiar talking points about climate change, renewable energy, immigration, and his own diplomatic record, alongside fresh distortions about the UN's New York headquarters. While a full fact-check of every statement goes beyond this article's scope, DW Fact check examined several of his key remarks.
World politics
New York Rangers
fromCurbed
7 months ago

The Waldorf Astoria's Billionaires-Only Club and Other Unrealized Plans

The Waldorf Astoria's renovation reopened after massive delays and cost overruns tied to ownership turmoil, pandemic interruptions, and complex landmarked building conversion.
US politics
fromBusiness Insider
7 months ago

A new uranium processing facility for US nukes is late and billions over budget as the old one crumbles, watchdog reports

U.S. uranium processing facility for nuclear weapons is delayed to 2034 and $4 billion over budget, forcing continued use of degraded 80-year-old facilities.
San Francisco
fromSFGATE
7 months ago

Cost quadruples to nearly $3 billion for SFO terminal remodel

SFO's Terminal 3 Modernization cost rose from $627 million in 2017 to $2.8 billion because of scope expansion, pandemic delays, and labor and material inflation.
fromBusiness Insider
8 months ago

F-35 stealth fighter deliveries have been falling farther and farther behind, watchdog finds

The US military is facing worsening delivery delays for its advanced F-35 Lightning II Joint Strike Fighters, according to a new government watchdog assessment. A report released Wednesday by the Government Accountability Office (GAO) found that most F-35s delivered in 2023 by contractor Lockheed Martin and engine maker Pratt & Whitney were late, arriving an average of 61 days behind schedule. In 2024, the problem grew notably worse: every F-35 delivered was late, with an average delay of 238 days.
US news
Mental health
fromHarvard Business Review
8 months ago

The Secret to Building a High-Performing Team

A recurring catastrophic project failure at a major automotive parts manufacturer causes losses of $80–100 million biennially, prompting a president to investigate root causes.
fromSan Jose Spotlight
8 months ago

Controversial Santa Clara County dam expansion scrapped - San Jose Spotlight

Our board's responsibility is to balance water reliability with affordability, and we are deeply concerned that moving forward with Pacheco would place too great a burden on our ratepayers without cost-effective benefits.
Environment
#national-childrens-hospital
California
fromwww.mercurynews.com
8 months ago

Plans to build the largest new Bay Area reservoir since 1998 collapse amid cost overruns and years of delay

The Santa Clara Valley Water District halted the Pacheco Reservoir project due to soaring costs, lack of partners, federal restrictions, and potential rate increases.
Science
fromwww.theguardian.com
8 months ago

In outback Australia, a telescope searches for a hidden universe. Down on Earth, misconduct claims rock the project

The Square Kilometre Array Observatory faces allegations of financial misconduct amid Australian cost overruns and a protected disclosure by a former senior employee.
fromenglish.elpais.com
8 months ago

Mexico's Maya Train: More than 60 workplace deaths, route changes and corruption allegations

A mistake in the automated track switches. An anomaly that should not have happened in the design of the railway system. This is how Oscar David Lozano, Director General of Mexico's Maya Train, explained the track incident during the morning press conference, which caused a minor derailment of two train cars at the Izamal station in Yucatan on Tuesday afternoon.
World news
fromABC7 Los Angeles
9 months ago

Trump and Powell bicker over cost of Fed building renovations as president visits site

Trump expressed his frustration with the renovation cost, stating it was $3.1 billion, while Powell remained silent, indicating a discrepancy with the Fed's figure of $2.5 billion.
Renovation
#bart-extension
[ Load more ]